Data Driven Block Replacement Scheduling

Authors

Do you know Aniruddhan Ganesaraman?You can claim authorship or link another user.Do you know VIdyadhar Kulkarni?You can claim authorship or link another user.

Abstract

We develop data-driven algorithms for maintaining $N$ independent identical machines under a \textit{block replacement policy}, in which each machine is replaced upon failure and all machines are jointly replaced at regular intervals of length $k$. The goal is to learn the cost-minimizing interval $k^*$ from operational data when the lifetime distribution is unknown. At each decision epoch, the operator selects $k \in \{1, 2, \ldots, K\}$, observes the resulting failure history (a mixture of complete and right-censored lifetimes) and incurs a per-unit-time cost governed by the renewal function. We formulate this as a stochastic multi-armed bandit and propose Hoeffding- and Bernstein-based lower-confidence-bound algorithms achieving $O(K \log T)$ regret, matching the Lai--Robbins lower bound. Exploiting a nested observation property unique to block replacement, correlated variants attain $O((K-k^*)\log T)$ regret and require only $O(1)$ direct pulls of suboptimal arms $k < k^*$. A complementary Kaplan--Meier renewal algorithm estimates the lifetime distribution nonparametrically from censored data, achieving almost-sure policy consistency and empirically near-zero incremental regret at long horizons. We additionally analyze two average-cost MDPs: a time-elapsed formulation establishing that block replacement is optimal within its policy class for any lifetime distribution, and an age-vector formulation proving a monotone threshold structure under increasing failure rate distributions and providing a gold-standard cost benchmark. Numerical experiments confirm the theoretical ordering and reveal structural cost gaps between optimal block and age-dependent replacement.

Community

00

Publication notes

Author note
36 pages, 4 figures